¡@

¡@ ¡@
¡@  ¡½ Champward Bulletin Board ¡@
¡@
2008/07/23 ISO 9001 Quality Management System is Annually Reviewed by TUV NORD.
¡@

Top


2008/07/23 ISO 14001 Environment Management System is Annually Reviewed by TUV Nord.
¡@

Top


2008/06/16 CNS Mark Certified Products are Regular Reviewed by the Taiwan Paint Industry Association.
¡@

Top


2008/05/02 ISO 9001 Quality Management System is Annually Reviewed by the Bureau of Standards and Metrology and Inspection.
¡@

Top


2008/04/08 Complete 400m Running Track of Kun Shan University.
¡@ This project adopted Champward CW-362 Full Pour System.

¡@

Top


2008/03/01 Champward CW-362 Full Pour System / Champward CW-363 Sandwich System / Champward CW-364 Structural Spray System is Certified Track Surfacing Products from IAAF.
¡@
¡@

Top


2007/10/26 Champward Aqueous Waterproofing Paint  CP-701 and CP-741 is certificated with Green Labels from the Environmental Protection Administration Executive Yuan.
¡@

Top


2007/07/09 ISO 9001 Quality Management System is Annually Reviewed by TUV NORD.
¡@

Top


2007/07/09 ISO 14001 Environment Management System is Annually Reviewed by TUV Nord.
¡@

Top


2007/05/28
ISO 9001 Quality Management System is Annually Reviewed by the Bureau of Standards and Metrology and Inspection.

Top


2007/04/20 National High Schools Athletic Games 2007 held in Tainan County Stadium,
Apr. 21 - 26.
Retopping Runing Track of  Tainan County Stadium completed Apr. 2007, which adopted  
Champward CW-362 Rubber-Chip Filled Full Pour System.   Sampling tests made by 
independant laboratories and complied with CNS Taiwan National Standards and  IAAF
Performance Specifications for Synthetic Surfaced Athletics Tracks.  Chinese Taipei Athletic
Association, in addtion, has checked and certified the completed track and field surfaces and
line marking.

Events: National High School Athletic Games 2007

Installation:

1. Priming

2. Base Coat

3. Defining Low Area
 and Patching

2. Checking Thickness

5. Wear Coat and Granular
Scattering

6. Measuring

7. Line Marking

8. Finish


Sampling in Site:

Top


2007/03/30 China Sportshow 2007, Let's meet in Chengdu!
Champward Chemical is at China Sportshow 2007 - the largest sporting facilities exhibition in China at Chengdu New International Convention & Exposition Center, Chengdu, Sichuan, May 17 - 20, 2007.  It would be a great pleasure to welcome you at our booth: 6B-104, 105.

Top


2006/12/26 Champward Asphalt Epoxy Paint CX-1984 is certificated with CNS mark from the Bureau of  Standards Metrology and Inspection.


No. 7337

¡@

Top


2006/11/20
¡@
Champward CA-102 System Cushioned Acrylic Sport Surface  is Classified Category 2 - Medium/Medium-Fast from ITF.
¡@

Top


2006/11/10
¡@
Complete 400m Running Track in the National Tsing Hua University, Hsin Chu, Taiwan.
Installed by Shaing Yng Co. adopted Champward CW-361  Full Pour (Total PU) System.  The main steps in the installation are:

1. Priming

2. Base Coat 3. Wear Coat and Granular
Scattering

4. Measuring -Certified by Mr. Lin, Eng Fu.

5. Marking

6. Line Marking

7. Finish

Top


2006/08/31 Kick off CX9012 Adhesive for Pre-fabricated Rubber Sheet/Mat.
Two-Component Epoxy Adhesive for pre-fabricated rubber mat/tile, remains resilient after curing.

Top


2006/08/18
¡@
CNS Mark Certified Products are Regular Reviewed by the Bureau of  Standards Metrology and Inspection.

Top


2006/08/15 Complete 400m Running Track of Kung Hsin Primary School.
This project adopted Champward CW-362 Full Pour (Rubber-Chip Filled) System.

Top


2006/08/15
¡@
Champward CA-101 Acrylic & CW-301 PU Sport Surface Systems are Classified Category 2 Medium/Medium-Fast from ITF.   

Top


2006/08/09 ISO 9001 Quality Management System is Annually Reviewed by TUV Nord.

Top


2006/08/08
¡@
ISO 14001 Environment Management System is Annually Reviewed by TUV Nord.

Top


2006/07/28 Kick off CW8**4 Matt Finish for Indoor Floors.
Tow component, Matt, non-gloss, light-stable finish for indoor floor surface.

Top


2006/04/21  National High Schools Sport Games, 2006 is Held in Hsin-Chu City Arena.
Hsin-Chu City Stadium adopted Champward CW-361 System to retopping 400m running track. The competition is held from 21 to 26th of April, 2006.

Top


¡@