|
¡@ |
¡@ |
| ¡@ |
¡½
Champward Bulletin Board |
¡@ |
|
¡@ |
|
2008/07/23 |
ISO 9001
Quality Management System is Annually Reviewed by
TUV NORD. |
|
¡@ |
Top |
|
|
2008/07/23 |
ISO
14001 Environment Management System is Annually Reviewed by TUV
Nord. |
|
¡@ |
Top |
|
|
2008/06/16 |
CNS
Mark Certified Products are Regular Reviewed by the Taiwan
Paint Industry Association. |
|
¡@ |
Top |
|
|
2008/05/02 |
ISO 9001
Quality Management System is Annually Reviewed by the
Bureau of Standards and Metrology and Inspection. |
|
¡@ |
Top |
|
|
2008/04/08 |
Complete 400m Running Track of Kun Shan University. |
|
¡@ |
This
project adopted Champward CW-362 Full Pour System. |
|
|
|
¡@ |
Top |
|
|
2008/03/01 |
Champward CW-362 Full Pour System /
Champward CW-363 Sandwich System /
Champward CW-364 Structural Spray
System
is Certified Track Surfacing Products from IAAF. |
|
|
|
¡@ |
Top |
|
|
2007/10/26 |
Champward
Aqueous Waterproofing Paint
CP-701 and CP-741 is certificated with Green Labels from
the Environmental Protection Administration Executive Yuan. |
|
¡@ |
Top |
|
|
2007/07/09 |
ISO 9001
Quality Management System is Annually Reviewed by
TUV NORD. |
|
¡@ |
Top |
|
|
2007/07/09 |
ISO
14001 Environment Management System is Annually Reviewed by TUV
Nord. |
|
¡@ |
Top |
|
|
2007/05/28 |
ISO 9001
Quality Management System is Annually Reviewed by the
Bureau of Standards and Metrology and Inspection.
|
|
Top |
|
|
2007/04/20 |
National High Schools
Athletic Games 2007 held in Tainan County Stadium,
Apr. 21 - 26. |
|
Retopping Runing Track of Tainan County Stadium completed
Apr. 2007, which adopted
|
|
Champward
CW-362
Rubber-Chip
Filled Full Pour System. Sampling
tests made by |
|
independant laboratories and complied with
CNS
Taiwan National Standards and
IAAF
|
|
Performance Specifications for Synthetic Surfaced Athletics
Tracks. Chinese Taipei Athletic |
|
Association, in addtion, has checked and certified the
completed track and field surfaces and |
|
line
marking. |
|
|
Events:
National High School Athletic
Games 2007 |
|
|
|
|
Installation: |
|
 |
 |
 |
 |
|
1. Priming |
2. Base Coat |
3. Defining Low Area
and Patching |
2. Checking Thickness |
|
 |
 |
 |
 |
|
5. Wear Coat and Granular
Scattering |
6. Measuring |
7. Line Marking |
8. Finish |
|
|
|
Sampling in Site: |
|
|
|
Top |
|
|
2007/03/30 |
China Sportshow 2007,
Let's meet in Chengdu! |
|
Champward Chemical is at
China Sportshow 2007 - the largest sporting facilities
exhibition in China at Chengdu
New International Convention & Exposition Center, Chengdu,
Sichuan,
May 17 - 20, 2007.
It would be a great pleasure to welcome you at our booth:
6B-104, 105. |
|
Top |
|
|
2006/12/26 |
Champward
Asphalt
Epoxy Paint CX-1984 is certificated with CNS mark from
the Bureau of Standards Metrology and Inspection. |
|

No. 7337 |
 |
¡@ |
|
|
Top |
|
2006/11/20
¡@ |
Champward CA-102 System Cushioned Acrylic Sport Surface
is Classified Category 2 - Medium/Medium-Fast from ITF. |
 |
 |
¡@ |
|
|
Top |
|
2006/11/10
¡@ |
Complete 400m Running Track in the National Tsing Hua
University, Hsin Chu, Taiwan. |
|
Installed by Shaing Yng Co. adopted
Champward CW-361 Full Pour (Total PU) System. The
main steps in the installation are: |
|
 |
 |
 |
|
1. Priming |
2. Base Coat |
3. Wear Coat and Granular
Scattering |
|
|
 |
 |
 |
 |
|
4. Measuring -Certified by Mr. Lin, Eng Fu. |
5. Marking
|
6. Line Marking |
7. Finish |
|
|
Top |
|
|
2006/08/31 |
Kick
off CX9012 Adhesive for Pre-fabricated Rubber Sheet/Mat. |
|
Two-Component Epoxy Adhesive for
pre-fabricated rubber mat/tile, remains resilient after curing. |
|
Top |
|
2006/08/18
¡@ |
CNS
Mark Certified Products are Regular Reviewed by the
Bureau of Standards Metrology and Inspection. |
|
Top |
|
|
2006/08/15 |
Complete 400m Running Track of Kung Hsin Primary School. |
|
This
project adopted Champward CW-362 Full Pour (Rubber-Chip
Filled) System. |
|
Top |
|
2006/08/15
¡@ |
Champward
CA-101 Acrylic & CW-301
PU Sport Surface Systems are Classified Category 2
Medium/Medium-Fast
from ITF.
|
|
|
|
Top |
|
|
2006/08/09 |
ISO
9001 Quality Management System is Annually Reviewed by TUV Nord. |
|
Top |
|
2006/08/08
¡@ |
ISO
14001 Environment Management System is Annually Reviewed by TUV
Nord. |
|
Top |
|
|
2006/07/28 |
Kick
off CW8**4 Matt Finish for Indoor Floors. |
|
Tow
component, Matt, non-gloss, light-stable finish for indoor
floor surface. |
|
Top |
|
|
2006/04/21 |
National
High Schools Sport Games, 2006 is Held in Hsin-Chu
City Arena. |
|
Hsin-Chu City Stadium adopted Champward
CW-361 System to retopping 400m running track. The
competition is held from 21 to 26th of April, 2006. |
|
|
|
Top |
|
|
¡@ |